Marlboro Township, Ohio 04/09/17

Rural Water Movement from Static Water Source

At the dump site a 2000 GPM ariel from Louisville metered and discharged the water supplied by Marlboro's E-411 with 2 suctions. Marlboro was drafting from 6 portable tanks. Lexington's E-382 was drafting from an additional portable tank through LDH to a hose monster with gauge to meter the flow rate.

 

Picture compliments of Stark FDRU via Dave Schlosser